Open Access Journal

ISSN : 2394-2320 (Online)

International Journal of Engineering Research in Computer Science and Engineering (IJERCSE)

Monthly Journal for Computer Science and Engineering

Open Access Journal

International Journal of Engineering Research in Electrical and Electronic Engineering(IJEREEE)

Monthly Journal for Electrical and Electronic Engineering

ISSN : 2395-2717 (Online)

Call For Paper : Vol. 9, Issue 1 2022
Unscheduled Interchanges under ABT

Author : Amit Kumar 1 Arvind Dhingra 2

Date of Publication :7th April 2016

Abstract: This Paper presents study in terms of profit earned by generating units by increasing or decreasing their generation under ABT. The decision for increasing or decreasing the generation is taken after the comparison between Unscheduled Interchange (UI) rate and incremental marginal cost (IMC) of generators. For this study ABT Based Load Frequency Controller for an isolated area having four generator power systems is used. All the generators are scheduled to generate less than their capacities. So that it can increase their generation in case of increase in sudden load demand. Frequency signal is converted into price by using Matlab function in accordance with the UI rates issued by Central Electricity Regulation Commission (CERC, INDIA) in year 2014. This controller ensures that generators respond to the UI price automatically and in a desirable manner. All the generator models are simulated in Matlab Simulink. The paper is organized as follows. In section I brief introduction is given. In Section II we explain concept of ABT. Section III comprises of details of ABT based load frequency controller. Details of simulation model and results are discussed in section IV. This is followed by conclusions in Section V.

Reference :

    1. NPTEL, Reforms in Indian power sector, Course Coordinated by IIT Delhi. [2] Mrs Surekha R Deshmukh, Dr Dattatray J Doke and Dr Yogesh P Nerkar “Optimum Generation Scheduling with Purchase of Power from Market and Grid”, TENCON 2009 IEEE Power India Conference.
    2. Bhanu Bhushan, “ABC of ABT_A Primer on Availability Tariff”, 2005 Available online: http://www.nrldc.org/docs/abc_abt.pdf
    3. S. Chanana and A. Kumar, “A Price Based Automatic Generation Control Using Unscheduled Interchange Price Signals in Indian Electricity System”, International Journal of Engineering, Science and Technology, 2(2), pp. 23-30.
    4. Central Electricity Regulatory Commission, Unscheduled Interchange Charges and Related Matters Regulation, CERC, 2014, New Delhi, India.
    5. HANS-PETTER HALVORSEN, “Introduction to Simulink”, Telemark University College Department of Electrical Engineering, IT and Cybernetics 2011.06.06.

Recent Article